Full preparations of the gyratory crusher before starting
已有 107 次阅读 2012-06-12 08:48 标签: starting crusher before
The main shaft is an extreme vital part of the gyratory crusher, it must
have sufficient strength and rigidity to ensure a normal operation of the
crusher. The foregoing fracture accidents of the shaft told us that they mostly
occur in the upper Gewindefreistiche, the lower part matching with the cone and
the interface of two different diameters. The factor that caused the fracture is
due to the crushing of oversized ores at the discharge opening and too fast
discharging.
The products’ granular property accounts a lot in crusher’s
operation, model selection or the next manufacturing and processing as well as
flow design and calculation. Elements influencing the granular property:
materials’ property, fines content during feeding, the type of a crusher and
operation etc.
Similar granular property of the gyratory crusher products, it
can be selected according to the grain size characteristic curves in the
instructions of the gyratory crusher. Therefore, for a better operation of the
crusher, Henan Hongxing Mining Machinery will describe the preparations for you
before starting.
1.Examining carefully that whether each part is in good
condition, all the connectors are tight and obstacles exist in the conveying
part( belt conveyor
).
2.Checking that whether there’s stone or iron ore(ore beneficiation) in the
crushing chamber. The foreign substance like ores must be cleared away to make
sure that the crusher get started in a non-load condition.
3.Checking the
auxiliary equipments such as the feeder, belt conveyer, electric equipment and
the signal device that whether they are in good condition.
4.Examining that
whether the size of the discharge opening complies with the production process
requirement.
5.Examining the oil level and oil temperature in the tank, using
heating equipment to heat the oil up to 20 degree when the temperature is pretty
low due to cold winter.
6.Checking the lubrication equipment and the
interlocks’ condition of the oil pump motor and the crusher motor.
After
finished the foregoing inspection and making sure that everything is
well-conditioned, then the crusher can be started via the starting
procedure.
上一篇: The analysis of vibrating screen at home in 2012 下一篇: The secret of small concentrators’ adopting jaw crushers
发表评论 评论 (0 个评论)