登录站点

用户名

密码

Details on Delivery Process of Hydraulic Cylinder

已有 133 次阅读  2012-06-20 17:34
Details on Delivery Process of Hydraulic Cylinder

Pulley device is used for the installation and maintenance of a tank cylinder with seven pairs of roller and a pressure roller in the slide below. Pressure roller can support the rail and car, press the slide rails maintain balance when run to the left. the hydraulic cylinder delivery process is as follows:
The modern economic development is inseparable from science and technology. The development of mining machinery are closely related to the progress of modern science and technology and the overall industrial level, in particular, is closely linked with the development of the science of mechanical engineering and mining disciplines. As a branch of mechanical engineering science, the development of mining machinery should follow the general trend of digitization, intellectualization, precision, miniaturization, life and ecology, meanwhile, combining with its own characteristics to develop digital, intelligent, ecological and pleasant mining machinery. On this basis, Hongxing machine, which is specialized in sand maker and ball mill, develops its own development strategies according to its own development.  1. first car from the c position shift military position car fixed, and then use the baffle. The purpose in doing so, make the slide move to the left from the right side of the first roller, car right side of the wheel to enter the slide of the second roller right side of the left sorrowful, ensure that the extravagant action smooth.
 2. The slide from the c position moved to the r-bit and pin rail mounting bracket. At this point the car into d.
3. When the board removed, the car moved to 0, and then fixed baffle.
4. using crane lift cylinder ear, and put hydraulic cylinder on the small car.
5. Shift the car back to the d and fixed rail will shift back to c, then the car moved back to b, the hydraulic cylinder hanging out repairs. Returned to hydraulic cylinder operation as above. Move the slide or a small car, you can use artificial, can also be set on both sides of the pulley by crane mobile.
The standard cone crusher structure. The rack is the entire crusher, all parts are mounted on the rack, it was four bolt fixed on the basis of The rib plate is connected to rack center sleeve and shaft set of simple and rack by rack center set of simple pressurestraight bushing. Direct the Village applied bronze material, can also be used nylon orbabbitt material. In order to prevent straight upward,  making two gaps in the straight bushing catchy opening, and loading   it down.

 

Magnetic separator : http://www.china-crusher.com/magnetic-separator5.html
Screw classifier : http://www.mine-crusher.com/classifier.htm  

上一篇: Role of coal mining plays in ball mill development 下一篇: The value of family affection

分享 举报