登录站点

用户名

密码

New Jaw Crusher Joins In Building Waste Process

已有 112 次阅读  2012-04-13 10:57   标签Crusher 

With the rapid development of economic construction, construction output was still increasing every year. In the construction, demolition, reconstruction, and waste generated on this one up to several billion tons each year. Give data analysis will produce 500-600 tons of construction: 10,000 m2 building construction process. In addition to construction waste, production and construction will also have this or that kind of solid industrial waste. So much construction waste from the above data, how to "digest" out to become the focus of attention.
Red Star machines using high-tech R & D and production of mobile crushing plant and a new jaw crusher is a recurrent problem in the treatment of urban architecture tailored for the earthquake super broken equipment, has become the undisputed most popular broken equipment. The new jaw crusher is a great improvement on the traditional jaw crusher, especially the use of hydraulics systems in the production process, strengthen the insurance performance of the machine, increasing the continuity of work, improve work efficiency .
Mobile crushing plant market is strongly recommended for architectural treatment, broken on the hard, strong corrosion of construction waste materials, select the most suitable for new jaw crusher. The use of the building, the market provides an efficient, environmental protection, safety equipment to achieve zero emissions, Red Star machines for a long time in situ investigation and practice of a mobile crusher configuration reorganization, the new jaw crusher into mobile processing into the crusher, the construction of an efficient environmental protection and energy saving processing equipment - mobile crushing plant (Mobile Crusher), this building processing equipment in full compliance with the indicators of national government resources recycling.
The mobile crushing plant set by the material, broken, transmit and process equipment as a whole, is a strong pipeline of crushing and screening operations, completion of the multiple needs of processing operations. The entire production line can have a new jaw crusher cone crusher, to the feeder, vibrating screen and conveyor, and a fully enclosed design, production line is equipped with dust removal equipment in addition to iron, integrated electronic control and so on. New jaw crusher added making the whole building to deal with more advanced equipment design, better performance, more efficient production, use and maintenance more convenient and more reliable, stable, relative to the fixed crusher station, with a new jaw large crusher mobile crusher like a mobile crushing small and medium-sized processing plants, of the efficiency and operating costs are superior to the same level or higher level of fixed crusher station.

上一篇: Pulverizer Applies in Nonmetallic Mineral Deposit 下一篇: Small Reform Increases Efficiency of Jaw Crusher

分享 举报